top of page
Hills Village Car Park
Grey Triangle
Hills Village Car Park
Grey Triangle

Hills Village Carpark and Commercial Building

Hamilton, New Zealand
Hills Village Car Park Arial view
Hills Village Car Park
Grey Triangle Outline.png


Project Overview

The Hills Village Carpark and Commercial Building in Hamilton required precise surveying to facilitate the design, construction, and compliance of a functional parking facility for the surrounding residential and commercial precinct. Summit Survey Ltd undertook a range of services to ensure the project was executed efficiently, meeting both regulatory requirements and modern standards for safety, accessibility, and sustainability.

Grey Triangle Outline.png

Scope of Surveying provided:

1. Pre-Construction Surveys

  • Topographic and Site Surveys

  • Boundary Surveys

  • Utility Mapping

 

2. Design Phase Surveys

  • Digital Terrain Modeling (DTM)

 

3. Construction Phase Surveys

Set-Out Surveys

Key construction elements were staked out on-site, including:

  • Piles and columns

  • Monitoring Surveys

  • Utility penetration holes

  • Structural Surveys

  • Building corners and foundation grids.

4. Post-Construction Surveys

As-Built Surveys

  • Parking spaces, kerbs, and pedestrian pathways.

  • Stormwater drainage systems, including manholes and outlets.

  • Utility connections and other infrastructure.

Grey Triangle Outline.png


Technologies and Methodologies Used

​​

  • GNSS and RTK Surveying: Provided high-accuracy positioning for site layout and construction staking.

  • UAV (Drone) Surveys: Enabled efficient aerial mapping for large-scale topographic surveys and as-built documentation.

  • Total Station Equipment: Ensured precise measurements for parking layouts, curbs, and utility placement.

  • GIS Integration: Facilitated the integration of survey data into design and management systems for seamless collaboration with project stakeholders.

Carpark survey

Get an estimate for your upcoming project

bottom of page